Project Summary:
Construction of three (3) new EMS substations, one at each location. Each location (Rose, Sodus and Walworth) are vacant lots that will be improved to accommodate a new one-story 5,577 sf +/- building to serve as an Emergency Medical Service ambulance base to provide EMS service coverage countywide. All three buildings are similar to each other. With one being a mirror image of the other two. All three sites are unique and will be improved to accommodate the single story building, utilities, and associated site improvements.
Each new facility includes three (3) ambulance garage storage bays, mechanical space, and first responder living quarters including: administrative offices, kitchen, lounge, bathroom, exercise room, storage areas, decontamination as well as other miscellaneous support spaces. The Work is entirely new construction and will be awarded in five (5) prime construction contracts including: Site Construction, General Construction, Plumbing Construction, Mechanical Construction and Electrical Construction contracts.
The project work includes: site work, new utilities, concrete, masonry, structural steel, cold formed metal and wood framing, finished carpentry, thermal and moisture protection, firestopping and sealants, roofing, light gauge metal framed gypsum board partitions, interior millwork, doors, frames and hardware, glazing, interior finishes including flooring, ceilings and walls, specialties, signage, built-in furnishings; domestic water and sanitary plumbing; mechanical HVAC systems; electrical power, lighting, fire alarm, security, access control, exterior site improvements as well as other miscellaneous work as described in the contract documents.
The work is being phase to allow for sequential construction activities at all three locations and shall be completed within 18 months (550 Calendar Days). Work shall begin at the Sodus site, followed by the Rose Site beginning 90 days later, followed by the Walworth site which shall begin 60 days after the start of work at the Rose site. Work is expected to be underway at all three sites simultaneously. A milestone project schedule is included in the specifications.