The Project consists of demolition of a 0.1 MG elevated water storage tank (Country Way Tank) located at the intersection of Country Way and Ridge Road; demolition of the 0.5 MG steel standpipe water storage tank (Comstock C Tank) located at the Comstock Rd site, rehabilitation of the 1.0 MG steel standpipe water storage tank (Comstock Tank) located at the Comstock Rd site, which includes but is not limited to interior and exterior coating, repair/replacement of hatches, replacement of the ladder, addition of multiport sample cabinet, wire cable clamps, instrumentation, addition of a mixer and associated electrical changes, installation of a sump pump in the tank vault structure, relocation of chemical feed equipment from the vault portion of the injection structure to the ground level; and installation of a PRV in an above ground enclosure with associated instrumentation at the Industrial Drive Booster Pump Station located on Graham Drive. Work also includes incidentals including but not limited to tree removal, loaming, seeding, grading, removal and reinstallation of fencing, test pitting, and demolition of utilities off site back to the road.