Project consists of renovation of a 9,571 square foot fire station along with new construction of a
2,880 square foot Storage Building. Site work to include paving work/repair, utility connections, and stormwater modifications. The renovation work includes selective demolition, new metal stud framed interior partitions, standing seam metal roofing, storefront windows and entry doors, hollow metal and wood doors, hardware, acoustical tile and gypsum board ceilings, flooring, painting, millwork, fire suppression, mechanical systems, plumbing systems, and electrical systems. The Storage Building work includes new construction of a pre-engineered metal building including
foundation, hollow metal doors, steel coiling roll-up doors, metal stud interior partitions, gypsum board ceilings, painting, mechanical systems, plumbing systems, and electrical systems.